CONCTRUCTION PERIOD – 3 YEARS. OPERATIONAL PERIOD – 27 YEARS. STATUS - AT THE STAGE OF DEVELOPMENT AND SIGNING OF THE DESIGN DOCUMENTATION. THE PROJECT HANGING OVER IS PROVIDED ON A TURNKEY BASIS, INCLUDING MEDICAL EQUIPMENT INSTALLATION.